Metro and monorail

Monorail number 3:

Alignment: Go Vap Roundabout – Quang Trung Software City – Tan Thoi Hiep.

Depot at district 12 with area of 5 ha.

Total length: 8,5 km.

Total investment cost (estimated): 200 million USD.

Period time: After 2010

Metro line 2:

Alignment: An Suong Bus Terminal – Truong Chinh – Tham Luong – Cach Mang Thang Tam – Ben Thanh – Thu Thiem.

Tham Luong depot at District 12 with area 25 ha (sharing depot with metro line No.6)

Total length: 19 km

Period time: 2010 – 2016

From QTSC to Tham Luong area, we need around 15 minitues

Metro line 4:

Alignment: Thanh Xuan (district 12) – Ha Huy Giap – Nguyen Oanh - Nguyen Kiem – Phan Dinh Phung – Hai Ba Trung – Ben Thanh – Nguyen Thai Hoc – Hoang Dieu – Nguyen Huu Tho – Nguyen Van Linh.

Total length: 24 km (19 km go underground and 5 km go elevated).

Number of station: 20 (15 underground stations and 5 elevated stations).

Depot No.1 with area of 30 ha at Thanh Xuan Ward, Go Vap district.

Depot No.2 with area of 25 ha at Rach Cay Kho, Hiep Phuoc Ward, Nha Be district.

Total investment cost (estimated): 2,5 billion USD.

Period time: After 2012

From QTSC to Thanh Xuan area, we need around 10 – 15 minutes

 